Winslow Junior High School · Jessica Bisson · April 1, 2025

Project Overview
We assembled the base. Then we grabbed a pipe and plugged it into the base. After that we took the shaft holder and screwed it in place. We put the shaft into the holder and put on the gears. We then took wood and made propellers and tested them.
Key Metrics
Wind Speed (m/s)
2.3
Rotor Swept Area (cm2)
38,465
Resistor Value (ohms)
68
Output voltage (V)
0.67