World KidWind Challenge
Kansas City
May 2027
RULES
The rules at the World KidWind Challenge may be different from the rules at your regional events and/or expand upon KidWind's Rulebooks. After a close read of the 2026-27 Wind and Solar Rulebooks, we encourage you to read the rules below carefully so that you aren't surprised!
Generator Divisions:
-
KidWind Division: SINGLE standard KidWind Generator (Teams in the 4-5th grade division must participate in this division).
-
Open Division: Any non-KidWind, commercially produced generator, high torque KidWind generator, multiple KidWind generators, OR turbine using harvested parts (coils, rotors) from other generators.
-
Homebuilt Division: ALL of the major components of the generator are constructed by the students. This would mean the coils are wound by the students and other components like the stators have been constructed, 3D printed, or otherwise built by the team.
You must declare your generator division when you submit your Team Profile form.
Your turbine will be inspected at the start of the event, locking-in your division. Turbines will be marked with colored stickers at this inspection to indicate the generator division.
No shrouds will be allowed on turbines at the World KidWind Challenge.
An event that causes a turbine in the wind tunnel to produce zero power while collecting test data is defined as a Catastrophic Failure Event. This could be due to either a mechanical or electrical failure.
If this happens, you will be offered the following options:
- Receive two minutes to set up your wind turbine again
- Remove the turbine to make repairs. In this case, you will be moved to the back of the line for retesting.
Failures that lead to REDUCED performance are NOT considered catastrophic, and a retest would not be allowed under these circumstances.
UPDATE: Catastrophic failures that are INDUCED by a mechanism will not be treated as a catastrophic failure and NO RETEST will be awarded. This means tripping something to cause a failure, like knocking a blade or gear off, does not qualify as a catastrophic failure.
Teams are allowed to have multiple generators and rotors in one turbine placed in the tunnel. All of these rotors must still fit into the standard wind tunnel.
Keep in mind that if you have multiple KidWind generators, you will be placed in the Open Division.
You must make sure that whatever generator and configuration you use provides DC power to our data loggers below 30V and 1A. If you go over for even 1 second, it can disrupt the software and we will be unable to get a reading.
LOADS
- KIDWIND Division: Teams must use the provided 30 ohm loads.
- OPEN Division: Teams can use the provided 30 ohm loads or any loads they wish.
- HOMEBUILT Division: Teams can use the provided 30 ohm loads or any loads they wish.
In the low, medium, and high speed tunnels, teams cannot change the load during the test. In the super tunnel, teams can actively adjust loads during the test.
POWER CONDITIONING
Maximum Power Point tracking, buck boost, and other similar devices are allowed as a part of power conditioning. Send any technical questions to Mike at Michael@KidWind.org.
BLADE CHANGES DURING TESTING
The spirit of this event is to construct ONE wind turbine that can handle many different wind conditions.
With this in mind, teams can:
- Change the pitch of blades they use in each of the wind tunnels.
- Replace broken blades.
- Change gearboxes and gearing between tunnels.
We STRONGLY discourage teams from changing the number of blades or using entirely different blade designs between tunnels.
BLADE CONSTRUCTION
Teams must construct/make all of their wind turbine blades themselves. A team can use blades constructed in a previous year if the majority of the team consists of the students who constructed the blades.
Other components (towers, gearboxes, generators, etc.) not constructed by the team can be used as long as the team discloses these components during their Judging Session. This includes parts that have been made by previous students or purchased.
Keep in mind that at Worlds we are in a space that we do not have full control over, making it impossible to provide the exact conditions needed to guarantee the wind tunnel speeds. As such, the actual measured speed of each wind tunnel may vary at the event from the anticipated speeds shared prior to arriving at the event. Part of this type of competition is adjusting along the way, and remember teams are competing against each other under the same conditions.
SOLAR HOME DIVISION (4-5TH, 6-8TH, & 9-12th GRADE): Solar panels must power all of the solar home’s loads. The loads can also be powered by using a supercapacitor as power storage, charged by the solar panels.
SOLAR SMART HOME DIVISION (6-8th & 9-12TH GRADE): Solar panels must power the majority of the solar smart home’s circuits. Microcontrollers do NOT need to be powered by solar.
See allowable & non-allowable storage examples in the 2026-27 Solar Rulebook.
The Solar Home and all accessories must fit within a 2’ width, 2’ length, 1' height space. This provides 4” of safe space between the max height of the solar home and the testing rig lights.
→ Each team is required to submit a materials list printed out. Find a materials list template here. You may use the template or make your own.
→ The material list is a document for teams to record all materials used in the solar home, the purpose of the material, if the materials are recycled, found, or new, and the costs of materials.
→ If the material is a 3D printed part, teams must explain if the file was found, modified, or created. Budget should identify 3D printed parts as new material cost. Material cost = filament price/filament weight x model weight.
See allowable & non-allowable materials lists in the 2026-27 Solar Rulebook.
Individual solar panels cannot exceed 6V or 1.1A, and the total solar panel configuration cannot exceed 24V, 2.2A, or 48W. Teams can use any number of solar panels, from any company. All solar panels must have the same voltage and current.
→ Teams can use any load to make their solar home more functional, interactive, and creative. These can include LEDs, incandescent bulbs, small motors, doorbells, repurposed switches, relays, etc.
→ Each circuit must have an “emergency” on/off switch that disconnects the power source from the rest of the circuit. These emergency switches must be clearly labeled and accessible.
→ Every Solar Home must include a master power switch that disconnects power to all circuits simultaneously. This master switch should beclearly labeled and easily accessible in the event of an emergency.
→ The Solar Smart Home Division requires a microcontroller, and any team using a microcontroller will be placed in the Solar Smart Home Division. The suggested grade range is 9th-12th, but ambitious younger teams can give it a try! 6th-8th grade teams entering a Solar Smart Home will be judged in a separate Middle School Solar Smart Home division.
→ Any microcontroller can be used.
→ There are no limits to how many microcontrollers can be used, as long as the requirements are followed.
→ The wiring diagram must label all functions of the microcontroller.
→ Teams must provide a print out of the programming code used, and labeled by microcontroller if multiple are used.
→ Most microcontrollers are powered by a separate battery pack using either disposable or rechargeable batteries. Rechargeable batteries may be charged before the competition using either solar power or a wall charger and then installed in your project.
→ Teams choosing to incorporate a microcontroller must be prepared to explain how it is powered, how it controls the system, and how it contributes to the overall performance of their Solar Home during the team’s presentation to the judges.
Adding energy storage to your Solar Home project can significantly increase both the complexity and functionality of your design. Because of the additional engineering and programming involved, we recommend this option only for advanced teams.
Forms of Energy Storage
- Capacitors or supercapacitors
- Rechargeable batteries
- Gravity-based storage systems
- Springs or elastic energy storage
- Other creative energy storage methods
Charging and Using Stored Energy Teams must clearly explain:
- How the energy storage system is charged by the solar panels.
- How stored energy is delivered to the electrical loads.
- What controls or triggers the release of stored energy (for example, a switch, sensor, timer, or programmable controller).
We recognize that the five-minute testing period is not sufficient to fully charge most batteries or capacitors. Therefore, teams are not expected to demonstrate a fully charged storage system during testing. Instead, teams should be prepared to explain the design, operation, and intended functionality of their storage system to the judges.
Supercapacitors
Teams may use supercapacitors as an energy storage device, provided they are charged solely by the solar panels. Judges may short the capacitors so they have no energy stored.
The following limits apply:
- Individual supercapacitors must have a maximum rating of 1 farad (1 F) and 2.7 volts (2.7 V).
- Multiple supercapacitors may be connected in series; however, the total voltage of the series combination may not exceed 6 volts.
- Teams must ensure that the charging voltage supplied by the solar panels does not exceed the rated voltage of the supercapacitor(s).
Diodes
To prevent stored energy from flowing back into the solar panels, a diode should be installed in series between the positive terminal of the solar panel and the positive terminal of the energy storage device.
The diode allows current to flow from the solar panels to the storage system, while preventing stored energy from flowing back into the panels. This ensures that stored energy is directed only to the electrical loads when the storage system is being used.
A charge controller is an electronic device that manages the flow of electricity between the solar panels, the energy storage system, and the electrical loads. Its primary purpose is to protect rechargeable batteries by preventing overcharging and excessive discharge. Charge controllers range from simple circuits found in small solar-powered devices, such as solar lanterns, to sophisticated systems used in residential and off-grid solar installations.
Designing and building a charge controller from scratch is beyond the scope of this competition for most teams. However, teams may use commercially available charge controllers or repurpose simple controllers from devices such as solar lanterns.
If a team chooses to use a charge controller:
- The charge controller must be shown on the team’s circuit diagram.
- Team members should be able to explain how the controller manages the flow of electrical energy between the solar panels, storage system, and loads.
- The charge controller must be used according to the manufacturer’s specifications and safety guidelines.
- Teams must include any required switches, fuses, or other safety devices needed to safely disconnect or isolate the electrical system in the event of a malfunction or emergency.
Teams must provide a written report, assembled in the order listed below, and organized in a binder or stapled together.
Report includes:
→ Cover Page
- Division
- Grade(s)
- Team name
- Number of team members not including the coach
- Coach name and contact email
- School name and location
- Cover image of solar home
- Size of solar home
- Solar home title
→ Solar Home Summary: Describe the general purpose of the solar home, who or what inhabits it, and the environment where it is located. For example: The LoneStar Space Garden provides astronauts in space an Earth-like sanctuary and food garden with plants, waterfalls, insects, and animals, all made possible by solar power.
→ Solar Home Narrative: Describe the solar home’s purpose, design, and connection.
→ Teamwork: Team members describe their roles and how they worked within the team.
If teams have an engineering design book or similar, they are encouraged to bring it with to Worlds as they may want to refer to something recorded in it while troubleshooting or speaking with the judges.
Solar Panel Schematics, Wiring Diagrams, Programming Code (Solar Smart Home teams only), and a Materials List must also be included in the Report. See details below and find specific Solar Report requirements in the 2026-27 Solar Rulebook.
All teams must provide Solar Panel Schematics: In the solar panel schematic, include each solar powered circuit’s configuration (parallel/series), and a label to what the terminals connect to. Label each panel’s rated voltage and current, and each configuration's voltage/current total.
Each circuit requires a separate solar panel schematic.
See Solar Schematics Examples here: Solar Panel Schematic Example 1, Solar Panel Schematic Example 2, Solar Panel Schematic Example 3.
→ Teams must provide a wiring diagram for each circuit in their project.
→ All age divisions have the option of using our Wiring Diagram Template.
→ Each wiring diagram must include a symbol key.
→ The wiring diagram must use the symbols for all the electrical parts of a circuit, and all parts clearly labeled.
→ Every emergency switch must be clearly labeled in the diagram.
→ If using power storage, teams must label how the solar panels are charging the power storage and how the storage is powering the loads on the device.
→ The wiring diagram is used in the judges’ scoring process.
See wiring examples here: Wiring Diagram 1, Wiring Diagram 2.
Solar Smart Home division only.
Explain where the file came from (did you find it? buy it? make it?)
The Solar Blast testing array will have light resulting in 300-400 W/m2, for reference the light output of the Sun is equivalent to 1000 W/m2.
These lights get very hot, and while the testing time is short, teams should consider how heat at close range can affect the different materials in their build.